Why it matters in orthopedics
Orthopedic clinic days mix visits with minor procedures: joint injections and aspirations (CPT 20600–20611), splinting and casting. Medicare treats procedures with 0- or 10-day global periods as minor procedures and includes same-day visits in their payment, so the E/M is paid only when it is separately identifiable and carries modifier 25.
Modifier 25 is also a long-running compliance focus. OIG’s 2005 report found that 35% of modifier 25 claims Medicare allowed in 2002 did not meet program requirements, and a 2026 OIG Work Plan project is reviewing E/M services paid on the same day as minor surgery without modifier 25. In July 2026, CMS proposed paying the lower-valued service at 50% when an office or outpatient E/M and a global procedure share a day; as of October 2026, that proposal is not final.
How it works
Use 25 only on E/M codes, and only when the same physician or qualified practitioner provides the E/M on the same day as a procedure (Medicare Claims Processing Manual, Chapter 12, §30.6.6.B).
The E/M must be significant, separately identifiable and above and beyond the usual pre- and post-procedure work.
The decision to perform a minor procedure is part of the procedure’s payment, for new and established patients alike. Being a new patient is not enough by itself (NCCI Policy Manual, Chapter I, Sections D and E, revised January 1, 2026).
Different diagnoses are not required.
Medicare does not require records with the claim, but both services must be documented. Contractors that find high, unsupported modifier 25 use can review records, educate the practice and add prepayment screens.
When an E/M on the day of or the day before a 90-day global surgery results in the decision to operate, use modifier 57, not 25.
Modifier 59 is not appended to an E/M; 25 is the E/M modifier.
All of these rules sit inside the global surgical package.
Orthopedic example
A 58-year-old established patient with right knee osteoarthritis arrives for a scheduled corticosteroid injection and mentions new, worsening left hip pain. The physician examines the hip, orders imaging and starts a treatment plan, then injects the knee. The practice bills 20610 with RT for the knee and an E/M with modifier 25 for the hip evaluation, with the level based on the hip work only.
If the visit had covered only the knee check before the injection, 20610 alone would be correct. Our injection-day guide walks through more knee, shoulder and hip scenarios.
Common denial triggers
The E/M note documents only the pre-injection assessment and consent.
Modifier 25 is appended to the procedure code. UnitedHealthcare’s Procedure to Modifier Policy (2026R0119A) does not pay a surgical code billed with 25.
25 is used instead of 57 for a decision for major surgery.
The E/M level counts work that belongs to the procedure.
Payer-specific rules are missed. Cigna’s Reimbursement Policy M25 (last updated February 20, 2026), for example, requires records with the initial claim for certain NCCI edits.
When the E/M is bundled into the procedure, remittances commonly show CARC CO-97.
How to prevent or fix
Write the E/M and the procedure note separately, and report the E/M only when it stands on its own.
Level the E/M on the separate work alone, and leave procedure time out of time-based leveling.
Review E/M-plus-procedure claims before submission, and track modifier 25 rates by provider.
Appeal denials with records when separate work is documented; otherwise accept the denial and educate.
Watch the CY2027 final rule; our CY2027 fee schedule overview covers the proposal.
Frequently asked questions
Does a new patient automatically qualify for modifier 25 on a procedure day?
No. The NCCI Policy Manual states that a patient being new is not enough by itself to justify an E/M on the same day as a minor procedure, and Medicare’s global rules include the decision to perform the procedure for new and established patients alike. A new patient visit is billable with modifier 25 only when the note documents significant, separately identifiable work beyond that decision.
Is modifier 25 used with casting or splinting?
Yes, when the E/M qualifies. NCCI treats casting, splinting and strapping codes as minor procedures with a 0-day global period, so a same-day E/M is reportable only if it is significant and separately identifiable, and the decision to apply the cast is part of the casting service. Fracture treatment codes already include the initial cast or splint, so it is not billed separately with them.
Will Medicare cut payment for E/M visits billed with modifier 25 in 2027?
It might. In the CY2027 Physician Fee Schedule proposed rule, CMS proposed paying the higher-valued service at 100% and other same-day services at 50% when the same physician or group furnishes a separately identifiable office or outpatient E/M on the same day as a 0-, 10- or 90-day global procedure. As of October 2026 the proposal is not final; the CY2027 final rule will settle it.
Does modifier 25 require a different diagnosis than the procedure?
No. CMS’s Claims Processing Manual, the NCCI Policy Manual and the UnitedHealthcare and Cigna policies all state that the E/M and the procedure may share a diagnosis. What reviewers look for is separate, documented work, such as the evaluation of a new problem, not a different diagnosis code on the claim.
Guides that cover this term
Can You Bill an E/M With Modifier 25 on an Orthopedic Injection Day?
Medicare rules, payer policies and a scenario table for billing a same-day E/M with modifier 25 alongside knee, shoulder and hip injections.
→
CY2027 Medicare Physician Fee Schedule: What It Means for Orthopedic Practices
CMS’s proposed 2027 fee schedule cuts the conversion factor, joint replacement RVUs and same-day E/M pay. What orthopedic practices should do now.
→
Related terms
Sources
Medicare Claims Processing Manual, Chapter 12: Physicians/Nonphysician Practitioners — CMS, Rev. 13753, issued May 7, 2026
Medicare NCCI Policy Manual, Chapter I: General Correct Coding Policies — CMS, revision date January 1, 2026
Medicare NCCI Policy Manual, Chapter IV: Surgery: Musculoskeletal System, CPT Codes 20000–29999 — CMS, revision date January 1, 2026
Global Surgery (MLN907166) — CMS Medicare Learning Network, December 2025
Use of Modifier 25 (OEI-07-03-00470) — HHS Office of Inspector General, November 2005
Evaluation and Management Services on Same Day as Minor Surgery With No Modifier 25 (OAS-26-04-028) — HHS OIG Work Plan, announced March 16, 2026
Calendar Year (CY) 2027 Medicare Physician Fee Schedule Proposed Rule — CMS fact sheet, July 14, 2026
Procedure to Modifier Policy, Professional (Policy Number 2026R0119A) — UnitedHealthcare Commercial and Individual Exchange, version dated May 1, 2026
Reimbursement Policy M25: Modifier 25 — Cigna Healthcare, effective April 20, 2009; last updated February 20, 2026
Global Days Policy, Professional (Policy Number 2026R0005E) — UnitedHealthcare Commercial and Individual Exchange, version dated September 20, 2026
This entry is educational and is not legal, coding-compliance or billing advice. Payer rules change often, so confirm requirements with the payer before you bill. CPT® is a registered trademark of the American Medical Association; code descriptions here are Rette’s plain-language summaries.